Westbound travel on SE Division is down to one lane due to roadwork. NW Natural is repairing gas lines along the roadway near SE 85th Ave. Affected traffic is diverted to the center turn lane for two blocks, creating a minor traffic slowdown.
Access to SE Division Street is blocked from SE 85th Ave’s north approach. Work is underway at an intersection recently rebuilt as part of the TriMet Division Transit Project. That Curb work had already cut into the road surface in this area, making it an ideal time for the gas line work. Now a single repair to the roadway will restore the street damage caused by two projects.

