Church Parking Lot Upgrade

Enhancements to SE 80th Ave’s paving and sidewalks have encouraged improvements to private property along that road. The Slavic Church Emmanuel has undergone an upgrade project to its parking lot, creating a new entrance onto SE 80th Ave. The new fence, gate, and lighting are nearing completion.

At the beginning of this year, SE 80th Ave received a complete overhaul from Bridger School to the Portland Community College’s southeast campus. For the first time on the section of the road sidewalks line the street. Additionally, a modern roadway now replaces the once deteriorated driving surface. Located at 2025 SE 82nd Ave, the church occupies a large lot that pushes back to SE 80th Ave. However, many drivers often avoided this section of the SE 80th due to its poor condition. Consequentially the church did not have access to the parking lot on that street.

Road construction cut into some of the church property on its western edge. Overgrown hedges and a small fence needed removal for the project, leaving the back parking lot exposed. The Slavic Church Emmanuel took the opportunity to install a black chainlink fence along the new roadway and created a curb cut leading to SE 80th Ave. Soon vehicles will have access to SE 80th Ave, in addition to the main entrance on SE 82nd Ave.

Beyond the parking lot’s border improvements, the asphalt parking surface has expanded. This weekend crews were at work spreading the oily rock several feet west. Now cars can drive right up to the back fence line. In perhaps the most useful upgrade, permit number 20-179802 will add “New parking lot lighting.”

These upgrades should make the parking lot safer and more accessible for members of the church. Additionally, this transformation to SE 80th Ave’s frontage will enhance the appearance of the street. The new parking lot light further illuminates the road, and the clean fence line makes the area look more active.