The Portland Bureau of Transportation (PBOT) recently installed new speed reader signs on 82nd Avenue near McDaniel High School. These displays provide real-time feedback on how fast motorists travel and alert drivers to “Slow Down” when exceeding the speed limit. In addition to these visible updates, traffic engineers will soon upgrade signal control units at 18 intersections, allowing staff to dynamically adjust red light timing and reduce opportunities for drivers to speed through multiple crossings without stopping.
Most traffic signal equipment on 82nd Avenue is 20 years old and requires manual adjustments to change signal light timing. New traffic signal controllers utilize modern means for managing intersections by interconnecting the equipment with high-speed fiber optic communications. This technology permits PBOT systems to monitor performance remotely in real time and shorten the overall wait time for all people traveling through a crossing. Although vehicles may encounter more stops along 82nd Avenue after these adjustments, it should reduce wait times for pedestrians and cross traffic. Safety enhancements will come from PBOT’s implementation of pedestrian head-start signals at several locations throughout the corridor. That signal timing strategy improves the safety and visibility of pedestrians by giving people a walk signal several seconds before vehicle operators see a green light.

These updates are just the beginning of a three-year critical update of 82nd Avenue’s infrastructure. They are part of an agreement reached by State and City officials while coordinating the former State highway’s transfer of ownership from the Oregon Department of Transportation (ODOT) to PBOT. In Spring, PBOT will continue corridor-wide signal technology upgrades, with pedestrian and bicycle improvements. Plans include improvements to road signage and striping along the corridor. In the Summer, crews will begin construction on six new signalized pedestrian crossings and street lighting improvements along the seven-mile-long road. The Oregon Department of Transportation (ODOT) will start an 82nd Avenue paving project in the Fall south of the city limits that partially extends into the City of Portland up to SE Faster Road.
PBOT’s Critical Fixes project will continue through 2026 and is the first stage of extensive investments in 82nd Avenue. These upgrades will deliver basic safety and maintenance repairs to the corridor. PBOT, Oregon Metro, and TriMet are developing plans for substantial changes to 82nd Avenue after 2026. Those projects are in the early planning phase but will continue the momentum of safety and shared priority for all modes of transportation along one of Portland’s busiest roadways.

Disclosure: The author of this article serves on the Building a Better 82nd Community Advisory Board and the 82nd Avenue Business Association Board.
Promotion: Montavilla News has a Patreon account. We invite those who can contribute to this local news source to please consider becoming a paid subscriber or sponsor. We will always remain free to read regardless of subscription.