Reconstruction of SE 82nd and Ash

On November 13th, the Portland Bureau of Transportation (PBOT) began constructing six enhanced pedestrian crossings along 82nd Avenue. During this work, crews will reconstruct the intersection at SE 82nd Avenue and Ash Street with a traffic-diverting raised median and pedestrian crossing signal lights. This Montavilla-based portion of the project will also improve stormwater management and add additional street lighting.

Demolition crews will remove an existing pedestrian refuge island installed on this intersection’s south crossing seven years ago. A 250-foot raised median along SE 82nd Avenue will replace it, creating a safe midway space for pedestrians using the north and south crosswalks. The center median will prohibit vehicles from turning left at the intersection and prevent through traffic on SE Ash Street. PBOT will install a signal mast on the southwest corner to hang Rectangular Rapid Flashing Beacons (RRFB) over the southern crosswalk.

Existing pedestrian refuge island (photo by Jacob Loeb)

Intersection design documents show space for five median-planted street trees or other foliage and space for additional street lights. Several high-capacity curb inlet storm drains will accompany new in-street catch basins, mitigating the flooding problems that often occur in the roadway. This work has several minor expansions of the public Right of Way into the adjacent properties, allowing sufficient pedestrian space at the reconstructed sidewalk corners, each featuring new Americans with Disabilities Act (ADA) compliant curb ramps. The north and south crossings will receive high-visibility crosswalk markings, calling driver attention to the higher likelihood of pedestrian use.

PBOT provided design document

Business access will remain mostly unchanged except when traveling on SE Ash Street. However, crossing five lanes of traffic on Ash often required long waits or risky maneuvers. PBOT will remove around two parking spaces SE Ash at the northeast and southwest corners. This curbside parking reduction provides additional space for vehicles turning into and off SE Ash while improving visibility.

As part of this 18-month-long project, PBOT is also updating crosswalks on 82nd Avenue at NE Beech, NE Klickitat, NE Schuyler, SE Clinton, and SE Schiller streets. Many of these pedestrian safety enhancements are part of the 82nd Avenue Critical Fixes funded during the jurisdictional transfer of 82nd Avenue from the Oregon Department of Transportation to PBOT. Work on these intersections will occur at different times over several months. TriMet 72 bus line riders should check for service alerts as construction will temporarily affect some stops. Drivers should anticipate lane closures while crews work in the roadway or along the edge of the street.

Main article image courtesy PBOT


Promotion: Help keep independent news accessible to the community. Montavilla News has a Patreon account. We invite those who can contribute to this local news source to consider becoming paid subscribers or sponsors. We will always remain free to read regardless of subscription.